{"id":7522,"date":"2024-08-19T11:32:47","date_gmt":"2024-08-19T14:32:47","guid":{"rendered":"https:\/\/www.secheep.gob.ar\/?p=7522"},"modified":"2024-08-19T11:41:22","modified_gmt":"2024-08-19T14:41:22","slug":"secheep-y-msu-conectaron-el-parque-solar-de-pampa-del-infierno-a-la-red-electrica-nacional","status":"publish","type":"post","link":"https:\/\/www.secheep.gob.ar\/?p=7522","title":{"rendered":"Secheep y MSU conectaron a la red el Parque Solar de Pampa del Infierno"},"content":{"rendered":"<p>Dando un paso significativo en la utilizaci\u00f3n de energ\u00edas renovables en la provincia, Secheep concret\u00f3 este domingo 18, la vinculaci\u00f3n del parque Solar de la empresa MSU Green Energy, ubicada en Pampa del Infierno, al sistema el\u00e9ctrico interconectado chaque\u00f1o y nacional.<!--more--><\/p>\n<p>En una primera etapa, el trabajo permitir\u00e1 inyectar 30 megavatios (MW) de potencia a la red de energ\u00eda el\u00e9ctrica de un total previsto de 130. Su funcionamiento pleno est\u00e1 previsto para octubre de este a\u00f1o.<\/p>\n<p>La tarea es llevada a cabo en el marco de un convenio firmado por MSU Green Energy y Secheep, con el acompa\u00f1amiento del Ministerio de Infraestructura, Obras y Servicios P\u00fablicos y la Subsecretar\u00eda de Energ\u00eda de la Provincia, que representa un salto exponencial en la generaci\u00f3n solar como una alternativa m\u00e1s econ\u00f3mica y sostenible.<\/p>\n<p>Adem\u00e1s de la conexi\u00f3n, el acuerdo establece la ejecuci\u00f3n de obras de ampliaci\u00f3n de la infraestructura el\u00e9ctrica para permitir el ingreso y correcto funcionamiento de la energ\u00eda renovable que se incorporar\u00e1 al sistema el\u00e9ctrico.<\/p>\n<p>El parque solar de la empresa MSU, el m\u00e1s grande de la provincia, fui construido a la vera de la ruta nacional N\u00ba 16, en Pampa del Infierno. En un predio de 320 hect\u00e1reas, cuenta con m\u00e1s de 223.000 paneles solares que representan la alimentaci\u00f3n energ\u00e9tica de m\u00e1s de 300.000 hogares.<\/p>\n<p>Las obras para la conexi\u00f3n abarcan una l\u00ednea de transmisi\u00f3n de alta tensi\u00f3n en 132 kv, la construcci\u00f3n de un nuevo campo en la estaci\u00f3n transformadora de Secheep y varios trabajos anexos.<\/p>\n<p>&nbsp;<\/p>\n<p><strong>Un positivo impacto ambiental, econ\u00f3mico y social<\/strong><\/p>\n<p>El proyecto de la planta solar y el impulso a las energ\u00edas renovables, forman parte del plan del Gobierno provincial de incentivar la inversi\u00f3n de capitales y la correcta utilizaci\u00f3n de los recursos naturales que aseguren progreso y desarrollo con un impacto positivo en lo ambiental, social y econ\u00f3mico.<\/p>\n<p>La generaci\u00f3n de energ\u00eda solar, en particular, representa una fuente de energ\u00eda limpia que puede ayudar a reducir la huella de carbono de la provincia y contribuir a los esfuerzos globales para combatir el cambio clim\u00e1tico. Adem\u00e1s, cerca de la demanda minimiza las p\u00e9rdidas de transmisi\u00f3n y distribuci\u00f3n, lo que resulta en una mayor eficiencia energ\u00e9tica.<\/p>\n<p><img loading=\"lazy\" class=\"alignnone size-medium wp-image-7523\" src=\"https:\/\/www.secheep.gob.ar\/wp-content\/uploads\/2024\/08\/dos-dos-300x179.png\" alt=\"\" width=\"300\" height=\"179\" \/><\/p>\n<p><img loading=\"lazy\" class=\"alignnone size-medium wp-image-7524\" src=\"https:\/\/www.secheep.gob.ar\/wp-content\/uploads\/2024\/08\/uno-267x300.png\" alt=\"\" width=\"267\" height=\"300\" srcset=\"https:\/\/www.secheep.gob.ar\/wp-content\/uploads\/2024\/08\/uno-267x300.png 267w, https:\/\/www.secheep.gob.ar\/wp-content\/uploads\/2024\/08\/uno.png 418w\" sizes=\"(max-width: 267px) 100vw, 267px\" \/><\/p>\n<p><img loading=\"lazy\" class=\"alignnone size-medium wp-image-7525\" src=\"https:\/\/www.secheep.gob.ar\/wp-content\/uploads\/2024\/08\/cuatro-300x218.png\" alt=\"\" width=\"300\" height=\"218\" \/><\/p>\n<p><img loading=\"lazy\" class=\"alignnone size-medium wp-image-7526\" src=\"https:\/\/www.secheep.gob.ar\/wp-content\/uploads\/2024\/08\/cinco-300x226.png\" alt=\"\" width=\"300\" height=\"226\" \/><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Dando un paso significativo en la utilizaci\u00f3n de energ\u00edas renovables en la provincia, Secheep concret\u00f3 este domingo 18, la vinculaci\u00f3n del parque Solar de la empresa MSU Green Energy, ubicada en Pampa del Infierno, al sistema el\u00e9ctrico interconectado chaque\u00f1o y nacional.<\/p>\n","protected":false},"author":4,"featured_media":7523,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_et_pb_use_builder":"","_et_pb_old_content":"","_et_gb_content_width":"","_joinchat":[]},"categories":[3],"tags":[],"_links":{"self":[{"href":"https:\/\/www.secheep.gob.ar\/index.php?rest_route=\/wp\/v2\/posts\/7522"}],"collection":[{"href":"https:\/\/www.secheep.gob.ar\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.secheep.gob.ar\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.secheep.gob.ar\/index.php?rest_route=\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"https:\/\/www.secheep.gob.ar\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=7522"}],"version-history":[{"count":4,"href":"https:\/\/www.secheep.gob.ar\/index.php?rest_route=\/wp\/v2\/posts\/7522\/revisions"}],"predecessor-version":[{"id":7530,"href":"https:\/\/www.secheep.gob.ar\/index.php?rest_route=\/wp\/v2\/posts\/7522\/revisions\/7530"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.secheep.gob.ar\/index.php?rest_route=\/wp\/v2\/media\/7523"}],"wp:attachment":[{"href":"https:\/\/www.secheep.gob.ar\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=7522"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.secheep.gob.ar\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=7522"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.secheep.gob.ar\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=7522"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}